2023-05-24

This is Audrey's DBGI daily open-notebook.

Today is 2023.05.24

Todo today

Have a look at the DBGI discussion forum

- https://github.com/orgs/digital-botanical-gardens-initiative/discussions

Doing

Paused

Done

Ornamental project - preparation of vials for LC-MS analysis

150 µL of extracts or blank were transfert to a vial for further analysis (orbitrap), QC was realised with 5 µL of the 38 samples. Vials were conserved at +4°C waiting for analysis

labellisation : DBGI_xxxxxx_01_01 refer to vial prepared on may 24th and analysed with orbitrap seq : 20230529_dbgi_alc (pos & neg)

Notes

NMRXiv = website pour deposer ses spectres RMN

Creation git repo : sur git créer le git repo ; sur le serveur dans le doc associé cloner 'git clone + code ssh' en local : copier le lien HTTPS, sur visualcode en local faire git clone et coller le https

Todo tomorrow